At F.E. Moran, we don’t just install plumbing—we engineer high-performance, large-scale systems that deliver unmatched efficiency, reliability, and technical precision. Our expertise is on full display at Project Heat, a 250,000 sq. ft. multi-level distribution center near Chicago’s Goose Island. This massive logistics hub required an advanced plumbing infrastructure, featuring up to 15-inch diameter underground piping, 8,000+ linear feet of underground piping, 7,000+ linear feet of above-ground piping, an extensive stormwater collection system, a powerful sewage lift station, and a Trecan snow-melting system—all designed and executed with the technical expertise that sets F.E. Moran apart.
The complexity and scale of Project Heat’s plumbing system demanded heavy-duty infrastructure capable of handling extreme water loads while ensuring long-term durability. F.E. Moran installed underground piping up to 15 inches in diameter, capable of carrying thousands of gallons of water per minute, reinforcing the facility’s resilience against severe weather and high-demand usage.
✔ 8,000+ linear feet of underground plumbing piping, up to 15 inches in diameter
✔ 7,000+ linear feet of above-ground piping
✔ Stormwater collection system managing 250,000 sq. ft. of roof drainage
✔ Massive sewage lift station to handle high-volume wastewater transport
✔ Trecan snow-melting system to help prevent rooftop snow accumulation issues
✔ Two levels of gang restrooms to support high-occupancy demand
With this level of heavy-duty plumbing infrastructure, Project Heat is built to function seamlessly, no matter the conditions.
With 250,000 sq. ft. of roof surface, this facility generates massive volumes of stormwater during heavy rain or snowmelt. F.E. Moran engineered a system to control and distribute this water safely and efficiently, helping to prevent flooding, ice buildup, and structural damage.
✔ Up to 15” underground piping, capable of moving extreme water loads
✔ 8,000+ feet of underground drainage for optimal stormwater flow
✔ 7,000+ feet of above-ground piping to distribute water effectively
✔ A dedicated lift station ensuring smooth wastewater transport into city systems
The stormwater collection system helps ensure flood prevention, operational continuity, and long-term infrastructure protection.
Winter in Chicago is brutal, and rooftop snow accumulation poses major risks, from structural strain to dangerous ice buildup. To mitigate these risks, F.E. Moran installed a Trecan snow-melting system, which melts rooftop snow and directs the water into the underground storm system.
✔ Rapidly melts and removes rooftop snow
✔ Helps prevent excessive weight loads on the structure
✔ Helps prevent ice buildup and drainage blockages
✔ Seamlessly integrates with underground stormwater piping
This high-efficiency system helps ensure Project Heat operates safely and smoothly, no matter how harsh the winter gets.
With multiple high-occupancy restrooms, Project Heat needed a robust wastewater management system that could handle large volumes of sewage without risk of overflow or downtime. The powerful sewage lift station ensures seamless waste transport with industrial-grade reliability.
✔ Designed to move thousands of gallons of wastewater per day
✔ Automated flow control for optimized efficiency
✔ Heavy-duty pumps help prevent backups and ensure continuous operation
Our system keeps operations running smoothly, helping prevent costly disruptions or maintenance concerns.
✔ Industry-leading expertise in high-volume plumbing infrastructure
✔ Capability to install and manage up to 15” diameter underground piping
✔ Proven success in complex, large-scale commercial projects
✔ Seamless integration with HVAC, mechanical, and fire protection systems
At F.E. Moran, we handle big, complex, high-stakes projects with precision, confidence, and cutting-edge technical expertise.
F.E. Moran – When You Need It Built Right.